January2016: Polytunnel Repair and cleanup

General clean up this month and filled a 12 cu.metre skip with rubbish. Polytunnel gutters cleaned and floor pathways repaired with new wooden slats so plastic sheeting is more secure. Dreadful weather continues with heavy rain and high winds.

November/December 2015: Record rainfall, Christmas celebrations, Engagement

Rain, rain and more rain for two months so redirecting water was an ongoing job but the house stayed dry. Christmas tree was cut down from the land and decorated ready for our family Christmas as the whole family were together for a change which was great. Exciting news of James and Jenny's engagement after Christmas Day proposal was accepted!

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square