March 2017: Garden Room

Phase 2 of the Garden Room done this month moving and installing the Douglas Fir timber frame. Impressive joints and construction by the amazing Willow Works team.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square