Sep 2012: Kitchen, bedroom and bathroom renovation starts

September 30, 2012

Kitchen gutted.  Water leak through kitchen ceiling showed deteriorating waste pipes in upstairs bathroom so bathroom had to be gutted.  Heavy cast iron bath moved to landing for two weeks until we had the manpower to shift it!  It's currently a 'water feature' on our patio...............

Water tank in spare bedroom enclosed and bedroom fully decorated.

Tags:

Please reload

Featured Posts

June 2016 - Abundance of Vegetables

June 30, 2016

1/10
Please reload

Recent Posts