November 2014: New steps and utility room floor

November 30, 2014

New electric cable put in from the barn to the woodshed.  Breeze blocks replaced with new wooden steps in the utility room.  Slate tiled floor installed in the utility room ready for the boiler installation.  Commissioned to make some beaded poppies for remembrance day.

 

 

Tags:

Please reload

Featured Posts

June 2016 - Abundance of Vegetables

June 30, 2016

1/10
Please reload

Recent Posts
Please reload

Archive