March 2021: Concrete management

Wall removed in front of the house as it was unstable. Concrete was finally crushed in the yard and cleared. 300 potatoes planted and beds prepared for this year's vegetables.







Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square